Project A Construction Pictures - March 2017

 

Project A LeftProject A Right

The contractor mixes and blends the soil for the future US 290 eastbound entrance ramp from Field Store Road. (left) Crews have placed steel rebar in preparation of paving for new eastbound mainlanes. (right)

Construction Picture Archive