Answers
What is the vision in regard to reconstructing
US 290?

The US 290 Project, which entails reconstruction of US 290 and Hempstead Tollway, covers a corridor of varying width that is approximately 38 miles long, extending from the interchange area of IH 10/IH 610/ US 290 northwest to FM 2920.

The overall vision for the US 290 Project includes:

  • Freeway capacity reconstruction and widening from IH 610 to FM 2920 to create:
    • Five general-purpose lanes in each direction from IH 610 to just west of Beltway 8, plus auxiliary lanes where appropriate
    • Four general-purpose lanes in each direction from just west of Beltway 8 to near the proposed SH 99/Grand Parkway, plus auxiliary lanes
    • Three general-purpose lanes in each direction from near the proposed SH 99/Grand Parkway to the west study limit, plus auxiliary lanes
    • Two- or three-lane frontage roads in each direction throughout the corridor

ALSO:

  • A four-lane, two-way managed lanes facility along Hempstead Tollway from IH 610 to the proposed SH 99/Grand Parkway
  • Two general-purpose lanes (possibly three) with curb and gutter in each direction to be reconstructed along Hempstead Highway from IH 610 to Beltway 8
  • US 290 METRO HOV operations moved to the Hempstead managed lanes
  • Proposed high-capacity transit corridor located along Hempstead Tollway
  • Bicycle and pedestrian improvements


Click here to see a map of the proposed changes. 

« More frequently asked questions