Project E Construction Pictures - July 2018

Project E Top LeftProject E Top RightProject E Bottom

The contractor digs a drill shaft for one of the columns which will support the inbound mainlane bridge over Huffmeister. (top left) Crews have begun demolishing the existing SH 6 bridge over the railroad tracks and Huffmeister, this work will continue through the end of 2018. (top right) The contractor is relocating water lines along Hempstead Road between Huffmeister and SH 6. (bottom)

 

 