Project E Construction Pictures - November 2017

Project E LeftProject E Right

A crew member spreads soil for the outbound mainlanes just before FM 1960. (left)  After spreading the soil, the contractor added lime to it. This stabilizes the soil before concrete pavement is placed on top. (right)

 

Construction Picture Archive