Project C-1 Construction Pictures - May 2018

Project C 1 LeftProject C 1 Right

The contractor is performing Next Generation Concrete Surface operations along the mainlanes between Mason and Mueschke. (left) In this process, the machine grinds the pavement, then places longitudinal grooves in it. (right) This helps reduce the noise created by tires rolling on the pavement, and this work will be done on all US 290 mainlanes.

 

 

Construction Picture Archive