Project C-2 Construction Pictures - February 2019

project c 2 picture

Work on this project is substantially complete.

Project C-2 Construction Pictures - January 2019

project c 2 picture

Work on this project is substantially complete.

Project C-2 Construction Pictures - December 2018

project c 2 picture

Work on this project is substantially complete.

Project C-2 Construction Pictures - November 2018

project c 2 picture

Work on this project is substantially complete.

Project C-2 Construction Pictures - July 2018

Project C 2 RightProject C 2 Left

The contractor places concrete for a drainage ditch between the railroad tracks and the frontage road. (left and right) Work on this project is substantially complete.

Project C-2 Construction Pictures - June 2018

Project C 2 Picture

A crew works down in a trench while relocating utility lines along the inbound frontage road near Bauer. Work on this project is substantially complete.

Project C-2 Construction Pictures - May 2018

Project C 2 LeftProject C 2 Right

Crews relocate utilities near the US 290/SH 99 (Grand Parkway) interchange. (left and right) Work on this project is substantially complete.

Project C-2 Construction Pictures - April 2018

Project C 2 Picture

Crews build a drainage outfall near Bauer. Work on this project is substantially complete.

 

Project C-2 Construction Pictures - March 2018

Project C 2 Picture Mar2018

The contractor works on the inbound frontage road just before Bauer.

 

Project C-2 Construction Pictures - February 2018

Project C 2 Picture Feb2018

Crews have completed Next Generation Concrete Surface operations on the inbound mainlanes before SH 99 (Grand Parkway). This process involves grinding and longitudinally grooving the pavement surface, decreasing tire and pavement noise. Construction on this project is anticipated to be completed in spring 2018.

 

Project C-2 Construction Pictures - January 2018

Project C 2 Picture

Crews are working to complete the outbound mainlanes between Bauer and Becker.

 

Project C-2 Construction Pictures - December 2017

Project C 2 LeftProject C 2 Right

Motorists travel on new inbound mainlane pavement near Bauer, (left) and also on new outbound frontage road pavement approaching SH 99 (Grand Parkway).

Project C-2 Construction Pictures - July 2017 

Project C 2 LeftProject C 2 Right

The contractor has placed new westbound sign structures at Fairfield Place (left) and at SH 99 (right).

Project C-2 Construction Picture - June 2017

Project C 2 Picture

The contractor continued building the eastbound mainlanes, including the entrance ramp from Bauer.

Project C-2 Construction Pictures - March 2017

Project C 2 Right

The contractor rolls asphalt for the US 290 eastbound mainlanes just before Mason.

 

Project C-2 Construction Pictures - February 2017

Project C 2 Left

Crews build the curb for the US 290 eastbound frontage road near SH 99 (Grand Parkway).

Project C-2 Construction Pictures - October 2016

 Project C 2 LeftProject C 2 Right

The contractor repairs a portion of concrete pavement along the US 290 westbound frontage road near Fairfield Place Drive. (left) Crews place down roadway base material for the widened US 290 westbound mainlanes near Becker Road. (right)

Project C-2 Construction Pictures - September 2016

 Project C 2 Picture

Crews use rollers in preparation for US 290 inbound mainlane widening near SH 99 (Grand Parkway). US 290 inbound will be three lanes in each direction in this area once construction is complete.

Project C-2 January 2016 Pictures 

Crews work on US 290 mainlane widening near Bauer Road.

 

Project C-2 November 2015 Pictures 

Crews install retaining wall panels for the widened outbound US 290 mainlanes just before Mason Road. The vertical tree-like pattern on these panels is part of the TxDOT Houston District’s Green Ribbon Project, an effort to improve the appearance of area highways.In the picture at left, you can see crews preparing right of way near Bauer Road for inbound US 290 mainlane widening. On the right is a picture showing lime-treated dirt, which provides stabilization so the inbound US 290 frontage road can be built on top of it.

 

Project C-2 October 2015 Pictures 

Project C 2

This image shows a portion of the inbound US 290 mainlanes which the contractor is widening. Crews have poured concrete on the right side, and will do the same over the steel rebar on the left. In the distance you can see SH 99 (Grand Parkway).