Project C-1 Construction Pictures - April 2015

Project C 1

In this picture, the contractor works to install storm sewer along the inbound US 290 frontage road just east of Mason Road. After that work is done, crews will build the new frontage road on top.

Project D Construction Pictures - April 2015

Project D LeftProject D Right

At left, a worker is shown on top of a new outbound US 290 mainlane section at Cypress Rose Hill. On the right is a picture of the new inbound US 290 mainlane retaining wall at Cypress Rose Hill. By the end of April 2015, most of this retaining wall and the inbound US 290 retaining wall at Spring Cypress had been completed.

Project E Construction Pictures - April 2015

Project E

This picture shows columns for the new direct connector from northbound SH 6 to the inbound US 290 mainlanes. Once that is built, those motorists will no longer have to travel through the signal at the US 290/SH 6 intersection.

Project F Construction Pictures - April 2015

Project F LeftProject F Right

The image at left shows the contractor at night, pouring concrete for the new inbound US 290 mainlane bridge over Eldridge. On the left, crews work on the outbound US 290 frontage road just west of FM 529.

Project G Construction Pictures - April 2015

Project G LeftProject G Right

These images show you progress on the outbound US 290 frontage road just east of Beltway 8. The contractor has laid down asphalt, over which concrete will be poured. The frontage road in this area is temporarily reduced to one lane.

Project I Construction Pictures - April 2015

Project I LeftProject I Right

These pictures show the contractor working on the outbound US 290 frontage road between Antoine Drive and W. 43rd Street. Crews will install new storm sewer, then build the new frontage road on top.

Project J-1 Construction Pictures - April 2015

Project J 1 LeftProject J 1 Right

On the left, the contractor drills a hole along outbound US 290 between Dacoma Street and Mangum Road. Later crews will build a column inside of it, for the new direct connector to US 290 coming from I-10. At right is an area just east of there, showing completed columns and hung beams for that same direct connector.

Project J-2 Construction Pictures - April 2015

Project J 2 LeftProject J 2 Right

You can see on the left the contractor clearing space for the new outbound US 290 mainlanes just east of W. 34th Street. Columns for those mainlanes are shown on the right, at W. 34th.

Project K Construction Pictures - April 2015

Project K LeftProject K Right

In the middle of the picture at left, you can see construction occurring on the new northbound I-610 mainlanes. At right is an image showing a crew on top of one the new northbound I-610 mainlane beams, waiting for a deck panel to come down to them. Those panels are installed on top of the beams, then crews build the mainlane pavement on top of the panels.