Project C-1 Construction Pictures - December 2016

 Project C 1 WBML Retaining Wall at Mueschke 2

Crews move soil that will ultimately form a portion of the US 290 westbound mainlanes  before Mueschke. 

Project D Construction Pictures - December 2016

Project D Left

Crews work on column placement for a noise barrier which is being constructed between the Cypress Mill Estates subdivision and US 290 near Cypress Rose Hill. Such barriers are being built in certain areas of US 290 to reduce the level of roadway noise near neighborhoods.

Project E Construction Pictures - December 2016

Project E Picture

The contractor continues work on the US 290 westbound frontage road between FM 1960 and Huffmeister. 

Project F Construction Pictures - December 2016

Project F Picture

Crews dig along the US 290 westbound frontage road near West Road. They will later place storm sewer here.

Project G Construction Pictures - December 2016

Project G Left Project G Right

Construction in Project G is now substantially complete. Both the US 290 eastbound mainlanes (left) and westbound mainlanes (right) have had Next Generation Concrete Surface work performed on them. That process reduces tire/pavement noise.

Project H Construction Pictures - December 2016

Project H LeftProject H Right

The contractor removes existing mainlane pavement from US 290 near W. Tidwell. (left) Crews dig along the US 290 eastbound frontage road just past Gessner, they will later place storm sewer here. (right)

Project I Construction Pictures - December 2016

Project I LeftProject I Right

The contractor removes a form for a bent cap along the US 290 westbound mainlane bridge over Bingle Road. (left) This month new westbound mainlane pavement opened from W. 34th to Hollister, a distance of about three miles; this includes the new exit to Bingle/Pinemont and the new entrance from Antoine. (right)

 

Project J-1 Construction Pictures - December 2016

 Project J 1 Picture

In the middle, motorists exit from I-610 northbound to US 290 westbound by using what will ultimately be the direct connector from I-10. On the left side of the photo, bridge beams have been placed on the future I-10 connector ramp to I-610 eastbound.

Project J-2 Construction Pictures - December 2016

Project J 2 LeftProject J 2 Right

Crews build steel cages for columns which will support the US 290 eastbound mainlanes just before W. 18th Street. (left) Just east of that area, the contractor places forms around mainlane column cages which are already built. (right) 