Project C-1 Construction Pictures - January 2017

 Project C 1 EBML and New Exit to Mueschke 2

Crews work to complete the new US 290 eastbound exit to Cypress Rose Hill/Fry.  With this exit, drivers will no longer have to exit before Mueschke to get to Cypress Rose Hill/Fry.

Project D Construction Pictures - January 2017

Project D LeftProject D Right

The contractor spreads base material for the US 290 westbound frontage road lanes just west of Cypress Creek (left and right) . 

Project E Construction Pictures - January 2017

Project E Left 2Project E Right

Motorists travel on new US 290 westbound frontage road pavement between FM 1960 and Huffmeister (left).  Crews work to demolish the old US 290 westbound frontage road in preparation to construct new westbound mainlanes. (right)

Project F Construction Pictures - January 2017

Project F Left

The contractor removes a portion of the US 290 westbound mainlane bridge structure over Eldridge Parkway. This is in preparation of widening the mainlanes.

Project G Construction Pictures - January 2017

Project G Picture

Construction on this project is substantially completed.

Project H Construction Pictures - January 2017

Project H Right

Crews relocate utilities on the US 290 eastbound frontage road near W. Tidwell. Once complete, the contractor can begin constructing the new eastbound frontage road.

Project I Construction Pictures - January  2017

Project I Picture

An excavator removes a portion of the old US 290 eastbound mainlanes near Bingle.  The contractor has completed a portion of the westbound mainlanes and is working on the eastbound lanes.

 

Project J-1 Construction Pictures - January 2017

 Project J 1 LeftProject J 1 Right

Crews work on the concrete bridge deck for the future entrance to I-610 North Loop eastbound from the future I-10 connector (left).  Work continues on the future I-610 West Loop northbound frontage road over Hempstead. (right)

Project J-2 Construction Pictures - January 2017

Project J 1 Picture

On the left is the future US 290 eastbound connector to I-610.  The contractor will build the eastbound mainlanes first, then switch to the westbound side.

Construction Picture Archive