Project A Construction Pictures - March 2017

Project A LeftProject A Right

The contractor mixes and blends the soil for the future US 290 eastbound entrance ramp from Field Store Road. (left) Crews have placed steel rebar in preparation of paving for new eastbound mainlanes. (right)

Project B Construction Pictures - March 2017

Project B PictureProject C 2 Left

Crews work at US 290 westbound and Roberts in preparation for mainlane widening. (left) The contractor is nearing completion of the US 290 westbound exit to Roberts/Katy Hockley. (right)

Project C-1 Construction Pictures - March 2017

 Project C 1 LeftProject C 1 Right

A crew mixes and blends soil west of Mueschke. (left) Another crew gets soil ready for compaction close to the Mueschke intersection, this work is being done for the US 290 eastbound mainlanes and frontage road. (right)

Project C-2 Construction Pictures - March 2017

 Project C 2 Right

The contractor rolls asphalt for the US 290 eastbound mainlanes just before Mason.

Project D Construction Pictures - March 2017

Project D Picture

A crew guides a panel into place for the sound wall along US 290 westbound, between the frontage road and the Cypress Mill Estates subdivision. Once completed, this sound wall will be slightly more than a mile long.

Project E Construction Pictures - March 2017

Project E Picture

Demolition continues of the center concrete barrier in preparation of the traffic switch, which will create space for mainlane construction and widening.

Project F Construction Pictures - March 2017

Project F Picture

Crews move soil to install an underdrain for the new retaining wall on the US 290 westbound mainlanes between West and Eldridge. In the background, you can see columns that will support the future mainlane bridge.

Project G Construction Pictures - March 2017

Project G Picture

A crew completes work around a pedestrian signal along the US 290 westbound frontage road at Senate. This project is substantially complete.

Project H Construction Pictures - March 2017

Project H Left

The contractor pours and vibrates the concrete bridge deck on the US 290 eastbound frontage road bridge over Cole Creek.

Project I Construction Pictures - March 2017

Project I LeftProject I Right

The contactor inspects the steel rebar on top of the US 290 eastbound mainlane bridge deck over W. 43rd. (left) Crews have placed beams for the eastbound mainlane bridge over Bingle. (right)

Project J-1 Construction Pictures - March 2017

Project J 1 Picture

The road on the left is the new I-610 West Loop northbound frontage road over Hempstead Road, which opened at the end of March 2017. To the right of that, is the future direct connector from I-10 to I-610/US 290.