Project A Construction Pictures - November 2018

project a ebml at ke k6ckG

Work on this project is substantially complete.

Project B Construction Pictures - November 2018

project b wbml at ro VCanu

Work on this project is substantially complete.

Project C-1 Construction Pictures - November 2018

Project C 1 LeftProject C 1 Right

Crews have completed Mason Road under US 290. (left) The contractor has also placed down asphalt and rebar for the outbound frontage road just before Mueschke. (right)

Project C-2 Construction Pictures - November 2018

project c 2 picture

Work on this project is substantially complete.

Project D Construction Pictures - November 2018

Project D Picture

The contractor made progress on a drainage system on top of which concrete for the High Occupancy Vehicle (HOV) lane will later be poured.

Project E Construction Pictures - November 2018

Project E topLeftProject E topRightProject E bottom

Crews have placed beams for a portion of the new SH 6/FM 1960 bridge over US 290. (top left) Crews are also close to opening the new SH 6 northbound direct connector to US 290 eastbound, (top right), and the contractor opened the US 290 eastbound mainlanes between Telge and Eldridge Parkway in December 2018. (bottom)

Project F Construction Pictures - November 2018

Project F LeftProject F Right

The contractor opened an additional outbound mainlane between FM 529 and Eldridge, bringing the total number of outbound mainlanes in that area to four. (left) Crews also opened up a portion of the outbound frontage road between FM 529 and Jones. (right)

Project G Construction Pictures - November 2018

Project G Picture

Work on this project is substantially complete.

Project H Construction Pictures - November 2018

Project H LeftProject H Right

Crews opened the outbound frontage road between Pinemont and Hollister. (left) The contractor also completed cross street intersections under US 290, including the one at Fairbanks North Houston. (right)

Project I Construction Pictures - November 2018

Project I LeftProject I Right

The contractor opened new outbound frontage road pavement just past Antoine (left), and poured new concrete for the outbound frontage road just before Antoine. (right)

Project J-1 Construction Pictures - November 2018

Project J 1 LeftProject J 1 Right

Crews opened the I-610 West Loop northbound and southbound frontage road U-turns at W. 18th (left). The contractor also continued building W. 18th underneath I-610, and that work was completed in December 2018. (right)

Project J-2 Construction Pictures - November 2018

Project J 2 LeftProject J 2 Right

The contractor opened the new exit ramp from I-610 westbound to the I-610 southbound frontage road, which allows motorists to access Old Katy Road. (left and right)

Project K Construction Pictures - November 2018

ProjectK

Work on this project is substantially complete.

 

Construction Picture Archive