Project A Construction Pictures - February 2019

project a ebml at ke k6ckG

Work on this project is substantially complete.

Project B Construction Pictures - February 2019

project b wbml at ro VCanu

Work on this project is substantially complete.

Project C-1 Construction Pictures - February 2019

Project C 1 Drill Shaft and Sand Testing near Mason 4Project C 1 Right

The contractor digs a drilled shaft near Mason into which an overhead sign column will be placed. (left) During this work crews test the soil where digging is occurring to make sure there is not too much sand in it, as that causes the soil surrounding the shaft to shift. (right)

Project C-2 Construction Pictures - February 2019

project c 2 picture

Work on this project is substantially complete.

Project D Construction Pictures - February 2019

Project D LeftProject D HOV Concrete Drilling near Telge and US 290 EB Traffic 4

Crews drill holes into the sides of concrete poured on the HOV lane near Telge. (left) Later the contractor installs steel rebar into the holes, that connect sections of concrete pavement. (right) This will complete the final section of the HOV lane in this project.

Project E Construction Pictures - February 2019

Project E LeftProject E Right

The contractor ties storm sewer pipe to an excavator along FM 1960 northbound near Wortham Boulevard. (left) The contractor then places the storm sewer pipe into the trench. (right) Once all storm sewer is placed, the contractor can construct the FM 1960 northbound frontage road on top.

Project F Construction Pictures - February 2019

Project F Picture

The new traffic signal is now operational at the US 290 outbound frontage road and Jones. This signal is post-mounted, replacing the temporary wire traffic signal in place during construction.

Project G Construction Pictures - February 2019

Project G Picture

Work on this project is substantially complete. This is the final US 290 mainlane configuration featuring four mainlanes inbound and outbound, and one reversible HOV lane, at the US 290/Beltway 8 interchange.

Project H Construction Pictures - February 2019

Project H Picture

With most of the work in this project substantially complete, crews are now finishing work on the cross street areas underneath US 290. Here a crew spreads aggregate rock between the US 290 eastbound to westbound U-turn lane and Hollister.

Project I Construction Pictures - February 2019

Project I LeftProject I Right

The contractor digs a drilled shaft between Antoine and W. 43rd into which an overhead sign column will be placed. (left) Along the cross streets underneath US 290, crews are also installing brick pavers which improve roadway appearance. (right)

Project J-1 Construction Pictures - February 2019

Project J 1 Picture

A crew uses a bulldozer to build a detention pond underneath the I-610/US 290 interchange. Work on this project is substantially complete.

Project J-2 Construction Pictures - February 2019

Project J 2 Right

The contractor is completing the detention ponds underneath the I-610/US 290 interchange. Work on this project is substantially complete.

Project K Construction Pictures - February 2019

Project K Picture

Work on this project is substantially complete.

Construction Picture Archive