Project A Construction Pictures - March 2018

Project A Picture Mar2018

Crews work to complete the inbound frontage road between Binford and Kickapoo.

 

Project B Construction Pictures - March 2018

Project B Left Mar2018Project B Right Mar2018

The contractor completes final work on the outbound mainlane bridge over Roberts/Katy-Hockley. (left) Crews install a new guardrail along the inbound frontage road near Roberts/Katy-Hockley. (right)

 

Project C-1 Construction Pictures - March 2018

Project C 1 Left Mar2018Project C 1 Right Mar2018

The new outbound entrance from Cypress Rose-Hill/Fry was opened to traffic. (left) Crews continued work on the widened outbound frontage road near Fairfield Channel. (right)

 

Project C-2 Construction Pictures - March 2018

Project C 2 Picture Mar2018

The contractor works on the inbound frontage road just before Bauer.

 

Project D Construction Pictures - March 2018

Project D Picture Mar2018

Crews pour concrete over steel rebar for the middle portion of the mainlanes between Barker Cypress and Skinner.

 

Project E Construction Pictures - March 2018

Project E Left Mar2018Project E Right Mar2018

New outbound mainlane pavement from Eldridge Parkway to Telge was opened to traffic. (left) The contractor built several column cages near SH 6 for the new direct connector from SH 6 northbound to US 290 inbound. (right)

 

Project F Construction Pictures - March 2018

Project F LeftMar2018Project F Right Mar2018

Crews demolished a portion of the Northwest Station Park and Ride T-Ramp to the METRO HOV, and began reconstruction of two of the bridge spans. (left) The contractor continued pouring concrete for the outbound mainlanes between FM 529 and Jones. (right)

 

Project H Construction Pictures - March 2018

Project H Left Mar2018Project H Right Mar2018

The contractor continued work on the inbound portion of the mainlanes. (left and right)

 

Project I Construction Pictures - March 2018

Project I Left Mar2018

Crews have poured concrete for the middle portion of the mainlanes from Antoine to W. 43rd. (left) They use a finishing machine during this work, which vibrates and smooths out the concrete after it is poured.

 

Project J-1 Construction Pictures - March 2018

Project J-1 Right Mar2018

Crews have begun grading operations for the detention ponds at the I-610/US 290 interchange.

 

Project J-2 Construction Pictures - March 2018

Project J 2 Left Mar2018Project J 2 Right Mar2018

The contractor has placed beams for the outbound mainlanes between I-610 and Dacoma, and built columns for the new outbound mainlane exit to Dacoma/Mangum. (left) Crews are also working to complete the new I-610 westbound exit to the I-610 southbound frontage road. (right) This will allow motorists to continue on the frontage road over Hempstead Road and the railroad tracks to access Old Katy Road.

 

 

Construction Picture Archive