Project D Construction Pictures - April 2019

Project D LeftProject D Right

This machine is performing Next Generation Concrete Surface operations on the High Occupancy Vehicle (HOV) lane near Skinner. (left) During this process crews grind and then cut longitudinal grooves in the pavement. (right) This work is being performed on the US 290 mainlanes and HOV lane, with the exception of bridges.

 

Construction Picture Archive