Project I Construction Pictures - May 2019

Project I LeftProject I Right

The contractor placed a new overhead sign bridge over both the inbound and outbound mainlanes between Antoine and W. 43rd. (left and right) There are two more overhead sign bridges scheduled to be placed over the mainlanes in June.

 

Construction Picture Archive