Project C-1 Construction Pictures - March 2019

Project C 1 LeftProject C 1 Right

The contractor builds a drainage inlet that will ultimately collect storm water from the widened US 290 outbound mainlanes before Mason. (left) Before the mainlanes can be constructed here, crews use a milling machine to remove asphalt from what was previously the outbound frontage road. (right) The contractor will recycle this material.

 

Construction Picture Archive