Project E Construction Pictures - April 2019

Project E LeftProject E Right

Crews work on a trench drain near Huffmeister which will ultimately collect water from the outbound mainlanes during rain events. (left) Work is also continuing to place storm sewer along SH 6 southbound, the new frontage road will later be built on top. (right)

 