Project E Construction Pictures - October 2019
The contractor continues to remove material from the demolished SH 6 bridge over Hempstead Road and the railroad tracks. (left) Between Hempstead and US 290, crews are digging drilled shafts for new SH 6/FM 1960 bridge columns. (right)