Project E Construction Pictures - February 2020

Project E LeftProject E Right

The contractor has placed many of the beams for the SH 6 bridge between US 290 and Hempstead Road. (left) Crews have also built several columns and constructed drilled shafts for other columns for the FM 1960 bridge between US 290 and Wortham Boulevard. (right)

 

Construction Picture Archive