Project C-1 Construction Pictures - February 2019

Project C 1 Drill Shaft and Sand Testing near Mason 4Project C 1 Right

The contractor digs a drilled shaft near Mason into which an overhead sign column will be placed. (left) During this work crews test the soil where digging is occurring to make sure there is not too much sand in it, as that causes the soil surrounding the shaft to shift. (right)

 

Construction Picture Archive