Project E Construction Pictures - November 2019

Project E Left Project E Right

The contractor has demolished the previous SH 6 bridge over Hempstead Road and the railroad tracks, and is now building columns for the new SH 6 bridge between US 290 and Hempstead. (left) The steel cages for the columns around which concrete is poured are made horizontally then placed vertically. (right)

 

Construction Picture Archive